TyGard 2000
Home Videos Instructions Images Quote Espanol Contact

Instructions: Loading and Unloading

Loading Instructions:


Loading Instructions Step 1 Loading Instructions Step 2 Loading Instructions Step 3 Loading Instructions Step 4
1. Cut two lengths of Ty-Gard 2000® for each band required and one 5 ft length of TY-PATCH®. Then peel the backing sheet from the Ty-Gard 2000 and apply the adhesive strip to the wall in the predetermined position. We suggest that the adhesive start at least 1 ft (30 cm) back from the face of the load. Ty-Gard 2000 should be parallel to the floor. Using the bonding roller press firmly to the wall. 2. Follow the same procedure on the opposite wall and bond to the contour of corrugations in Containers. Then finish loading materials in to the Container. Please contact your Ty-Gard 2000 representative to help you determine the number of bands required for your load (HAZMAT and Railroad loads require additional bands). 3. Pull the Ty-Gard 2000 strips across the face of the load overlapping ends at least 1 ft (15cm). Cut excess if necessary. 4. Next insert clothespin through the overlapping portions.
       
Loading Instructions Step 5 Loading Instructions Step 6 Loading Instructions Step 7

Watch the
Installation Video



Watch the Alternate
Installation Video



Watch the Alternate
Installation Video (SPANISH)

5. Place the small wrench on first with the long wrench on top, position the handle flush against load. Both wrenches in matching "off" position. 6. Use the small wrench to tension Ty-Gard 2000 7.Remove backing and place TY-PATCH® across barrier using the bonding roller to assure proper adhesion. Use tape to attach Ty-Gard 2000 to the cargo.

 

Unloading Instructions:


Unloading Instructions Step 1 Unloading Instructions Step 2 Unloading Instructions Step 3
1. Cut the TY-PATCH® with a pair of scissors. 2. Tape or tuck the strips out of the way and unload the container. 3. Peel the Ty-Gard 2000 strips toward the nose of the container and dispose.